Windows and child fall prevention
Assess low operable windows, climbable furniture, non-structural screens, restrictors/guards and local rules without compromising required egress.
VERT / GREEN = documenter/entretenir · JAUNE / YELLOW = mesurer/vérifier · ROUGE / RED = arrêter et faire valider.
What the professional checks
- Verify local guard/opening and egress rules
- Select device compatible with window and use
Official sources
ASPC — chutes d’enfantsCNRC — Guide Partie 9Checked: 2026-08-22
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Explore: Systems to check before closing the work
Systems to check before closing the work
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Explore: Specialized diagnostics to verify
Specialized diagnostics to verify
This section connects systems that become costly or regulated when a primary project triggers them.
Explore: Edge systems to integrate into the project
Edge systems to integrate into the project
This section covers interfaces that become important when multiple home systems interact.
Explore: Often-overlooked service interfaces
Often-overlooked service interfaces
This section connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
Explore: Project risks and overlooked interfaces
Project risks and overlooked interfaces
This section connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
Explore: Household safety and compliance details
Household safety and compliance details
This section connects smaller risks that often fall between finishes, appliances, plumbing and local code.
Explore: Shared, access and specialized interfaces
Shared, access and specialized interfaces
This section connects projects where multiple systems, owners or rules meet.
Explore: Post-disaster and legacy systems
Post-disaster and legacy systems
This section connects contamination, storm damage, legacy materials and recommissioning before rebuilding.