VERT / GREEN
During full replacement, inspect the rough opening and document slope, membrane and drainage.
Give water reaching an opening a path back outdoors through membrane sequencing, sill pan and flashing.
During full replacement, inspect the rough opening and document slope, membrane and drainage.
Exterior caulk is not a substitute for a draining sill and properly shingled layers.
Rotten framing, no drainage path or leak reaching indoors: correct opening/wall before installing the new unit.
Checked 2026-08-22.
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V18 connects systems that become costly or regulated when a primary project triggers them.
V19 covers interfaces that become important when multiple home systems interact.
These tools connect structure, water, air, frost, wind and mechanical systems so repairs do not hide the cause.
V26 connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
V29 connects smaller risks that often fall between finishes, appliances, plumbing and local code.
V30 connects projects where multiple systems, owners or rules meet.
V31 helps verify systems after work and document the values that make a home safer to operate.
V32 connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
These details are small on a drawing but can control water, structure or durability.