VERT / GREEN
Photograph ridge/roof lines and measure safe reference points.
Read roof geometry, loads, supports and past alterations before jacking or concealing sag.
This tool is for triage and documentation; structural, fire, gas, refrigerant and electrical work remains subject to applicable rules and professionals.
Photograph ridge/roof lines and measure safe reference points.
Old stable sag differs from recent movement caused by snow, moisture, cut framing or support changes.
Recent movement, split/decayed wood, altered truss, overloaded roof or spreading wall: engineer/pro and safety management.
Sources checked / sources vérifiées: 2026-08-22
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V17 completes gas, soil, water, fire, climate and structural interfaces.
V18 connects systems that become costly or regulated when a primary project triggers them.
V19 covers interfaces that become important when multiple home systems interact.
V26 connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
V28 connects small details that become costly once finishes are closed.
V30 connects projects where multiple systems, owners or rules meet.
V32 connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
These details are small on a drawing but can control water, structure or durability.