Priority 9

Prepare the right permit question before starting

This questionnaire classifies the review level and gathers questions to ask. Only the local authority can confirm the exact scope.

Practical guide

Use this tool well

The navigator prepares questions, but only the authority having jurisdiction confirms permits, drawings, professionals and inspections. Describe the exact scope, moved systems, current and proposed use, then keep the written answer or file number.

  • Verify before purchasing or demolition.
  • Ask about pre-concealment inspections.
  • Record the department, date and answer.

After the results: keep assumptions, verify official sources and document any decision that changes cost, schedule or safety.

1. Location and project

2. What the project changes

Turn the result into a useful record

Record the date, scope, measurements and price source. Then link the result to the project file, calendar, photos and decision register. An isolated value ages quickly; a dated, connected value remains verifiable.

Before signing, purchasing or closing a wall, confirm requirements for the exact product, local authority and required professionals.