Attaching through continuous exterior insulation
Awnings, lights, services and equipment must transfer loads without crushing insulation or creating water/air paths.
Decision triage
VERT / GREEN · JAUNE / YELLOW · ROUGE / RED
What the professional checks
The professional checks load, anchorage, blocking, fastener type/length, thermal bridge and WRB/air-barrier continuity.
Official sources
Sources checked: 2026-08-24
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Remaining system checks not to miss
V15 covers issues that can block a project, cause a loss or become expensive once concealed.
Edge systems to integrate into the project
V19 covers interfaces that become important when multiple home systems interact.
Often-overlooked service interfaces
V26 connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
Finish and service details to verify
V28 connects small details that become costly once finishes are closed.