VERT / GREEN
Estimate hot-water demand, orientation/shading and roof condition before choosing a system.
Coordinate collectors, roof, heat exchanger, storage, freeze/overheat protection and backup water heating for Canadian climate.
Estimate hot-water demand, orientation/shading and roof condition before choosing a system.
Year-round operation requires real freeze and overheating protection plus heat-transfer-fluid/exchanger maintenance.
End-of-life roof, uncertain structure, unknown pressurized loop or failed freeze protection: correct/design before installation.
Checked 2026-08-22.
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V17 completes gas, soil, water, fire, climate and structural interfaces.
V18 connects systems that become costly or regulated when a primary project triggers them.
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
V28 connects small details that become costly once finishes are closed.
V30 connects projects where multiple systems, owners or rules meet.
V34 connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.