Gather inverter model, DC/AC rating, single-line diagram and equipment locations.
Treat modules, inverter, protection, metering, grid hosting capacity and final authorization as one electrical project.
Gather inverter model, DC/AC rating, single-line diagram and equipment locations.
A good roof and modules alone do not guarantee the project can connect to the grid.
Never self-connect generation to the grid; utility authorization and electrical contractor work are distinct required steps where applicable.
The electrical contractor designs/installs and submits the application; the utility reviews the grid and authorizes parallel operation under its standards.
Vérifié / checked: 2026-08-23
These links connect this page to the next useful checks and decisions without repeating the full content.
This section completes gas, soil, water, fire, climate and structural interfaces.
This section connects systems that become costly or regulated when a primary project triggers them.
This section connects projects where multiple systems, owners or rules meet.
This section connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.