Solar: inverter, interconnection and grid authorization

Treat modules, inverter, protection, metering, grid hosting capacity and final authorization as one electrical project.

VERT / GREEN

Gather inverter model, DC/AC rating, single-line diagram and equipment locations.

JAUNE / YELLOW

A good roof and modules alone do not guarantee the project can connect to the grid.

ROUGE / RED

Never self-connect generation to the grid; utility authorization and electrical contractor work are distinct required steps where applicable.

Project triage

What the professional checks

The electrical contractor designs/installs and submits the application; the utility reviews the grid and authorizes parallel operation under its standards.