Portable fire extinguisher: selection, location and maintenance
Integrate the extinguisher into the escape plan: listed unit, location near an exit, clear access, inspection and a clear threshold for evacuation.
VERT / GREEN
A listed accessible ABC extinguisher can complement alarms and an escape plan.
JAUNE / YELLOW
A used, damaged, depressurized or poorly located extinguisher needs service/replacement.
ROUGE / RED
Growing fire, heavy smoke or compromised exit: evacuate immediately and call emergency services; do not fight the fire.
Quick triage
What the professional checks
Fire service/qualified personnel can advise on placement/use and provide appropriate inspection/service.
Official sources
Checked 2026-08-23
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Tools related to this issue
Manage the project through closeout
Explore: Systems to check before closing the work
Systems to check before closing the work
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Explore: Specialized systems to cross-check
Specialized systems to cross-check
This section completes gas, soil, water, fire, climate and structural interfaces.
Explore: Often-overlooked service interfaces
Often-overlooked service interfaces
This section connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
Explore: Post-disaster and legacy systems
Post-disaster and legacy systems
This section connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
Explore: Invisible constraints before work
Invisible constraints before work
This section checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.
Explore: Use, excavation and construction constraints
Use, excavation and construction constraints
This section connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.