VERT / GREEN
New installation without leakage signs: inspect flashing, drainage and joints before enclosure.
Test windows, doors or envelope interfaces using a controlled method that represents relevant exposure without intentionally flooding the assembly.
New installation without leakage signs: inspect flashing, drainage and joints before enclosure.
High-exposure project or recurring defect: consider standardized field testing early enough to correct details.
An improvised hose test can unrealistically overload details, redirect water or cause damage; use a defined method.
Sources checked: 2026-08-22. Confirm local rules and the applicable edition.
These links connect this page to the next useful checks and decisions without repeating the full content.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V19 covers interfaces that become important when multiple home systems interact.
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
V28 connects small details that become costly once finishes are closed.
V32 connects contamination, storm damage, legacy materials and recommissioning before rebuilding.