VERT / GREEN
Reliable well/septic records available: plot them on the site plan.
Cross-check an addition, pool, accessory building, deck or excavation against the well, tank and leach field before final siting.
Reliable well/septic records available: plot them on the site plan.
Approximate location or older system: locate components before excavation and verify applicable setbacks.
Distances depend on system type and regulation; do not use one generic number for every project.
Sources checked: 2026-08-22. Confirm local rules and the applicable edition.
This section connects water, soil, climate, safety, materials and seasonal use to existing projects.
This section completes gas, soil, water, fire, climate and structural interfaces.
This section connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
This section connects smaller risks that often fall between finishes, appliances, plumbing and local code.