VERT / GREEN
Recent building with documented materials: keep product data and verify areas actually disturbed.
Turn asbestos/lead/PCB/mercury topics into a pre-disturbance checkpoint: identify risky materials before sawing, hammering, sanding or demolition.
Recent building with documented materials: keep product data and verify areas actually disturbed.
Older home or unknown history: develop a targeted inventory based on age, materials and scope before demolition pricing.
Do not discover asbestos or other hazardous materials by accident during demolition; stop if uncharacterized suspect material is encountered.
Sources checked: 2026-08-22. Confirm local rules and the applicable edition.
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.