Post-renovation as-built record package
Turn photos, field changes, drawings, warranties, tests and service locations into a package useful ten years later.
Triage and file-closeout tool — not legal, tax, insurance or financing advice. Données vérifiées: 2026-08-23.
VERT / GREEN
Close-in photos, product data, marked-up plans, invoices, warranties and commissioning results are grouped.
JAUNE / YELLOW
Design drawings do not always show what was actually built; mark changes and hidden service routes.
ROUGE / RED
A certificate of location describes the current property situation but does not replace technical as-built drawings; after major exterior changes, verify whether a new certificate is needed.
Checks
What the professional checks
- Compile changes, tests, close-in photos and equipment
- Determine professional/property documents that need updating
Official sources
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Finish and service details to verify
V28 connects small details that become costly once finishes are closed.
Warranties, disputes and resale
V38 organizes evidence and rules that survive the construction project.
- Installed-product warranty passport
- Defect: manufacturer, installer or contractor?
- Contractor dispute: evidence, formal demand and remedies
- Resale: disclose renovations, events and known issues
- Condo: post-renovation record handoff
- Principal residence and rental: tax change of use
- Major renovations and rent adjustment
- Quick resale after renovation: 365-day flipping rule
- Transfer warranties and records to the next owner
- Recalls for installed products and building materials