Resale: disclose renovations, events and known issues
Prepare an honest history of renovations, losses, repairs and adverse factors with available evidence.
Document triage — not legal/tax advice or a warranty decision. Données vérifiées: 2026-08-23.
VERT / GREEN
Invoices, permits, reports and corrective work are organized.
JAUNE / YELLOW
A corrected condition may still need disclosure with repair evidence.
ROUGE / RED
Do not remove a known issue from the history merely because it was repaired or covered.
Checks
What the professional checks
- Distinguish known fact, opinion and professional report
- Prepare evidence and disclosure updates
Official sources
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Specialized diagnostics to verify
V18 connects systems that become costly or regulated when a primary project triggers them.
Edge systems to integrate into the project
V19 covers interfaces that become important when multiple home systems interact.
Finish and service details to verify
V28 connects small details that become costly once finishes are closed.
Post-disaster and legacy systems
V32 connects contamination, storm damage, legacy materials and recommissioning before rebuilding.