Drilling/notching studs and plates without weakening framing or exposing services
Coordinate plumbing, wiring, structure, protective plates and fire stopping before closing a wall.
Decision triage
VERT / GREEN · JAUNE / YELLOW · ROUGE / RED
What the professional checks
The professional checks notch/hole limits, bearing condition, service protection, fire stopping and air/vapour continuity.
Official sources
Sources checked: 2026-08-24
Explore: Systems to check before closing the work
Systems to check before closing the work
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Explore: Advanced diagnostics to cross-check
Advanced diagnostics to cross-check
This section connects water, soil, climate, safety, materials and seasonal use to existing projects.
Explore: Commissioning and everyday safety
Commissioning and everyday safety
This section helps verify systems after work and document the values that make a home safer to operate.
Explore: V47 interfaces not to miss
V47 interfaces not to miss
These details are small on a drawing but can control water, structure or durability.