Smoke/CO alarms during renovation
Use wall openings and electrical changes to verify certified devices, power, location, interconnection and replacement under local rules and manufacturer instructions.
VERT / GREEN = documenter/entretenir · JAUNE / YELLOW = vérifier avant travaux · ROUGE / RED = arrêter le DIY et faire valider.
What the professional checks
- Verify certification, power and local code
- Coordinate placement/interconnection with project
Official sources
Santé Canada — sécurité incendieSanté Canada — monoxyde de carboneChecked: 2026-08-22
Tools related to this issue
Explore: Systems to check before closing the work
Systems to check before closing the work
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Explore: Finish and service details to verify
Finish and service details to verify
This section connects small details that become costly once finishes are closed.
Explore: Post-disaster and legacy systems
Post-disaster and legacy systems
This section connects contamination, storm damage, legacy materials and recommissioning before rebuilding.