Renovation financing and progress advances
Align scope, cash flow, inspections and payment stages when the lender does not release all funds upfront.
Triage and file-closeout tool — not legal, tax, insurance or financing advice. Données vérifiées: 2026-08-23.
VERT / GREEN
Detailed budget, contingency, quotes and schedule are ready before arranging financing.
JAUNE / YELLOW
Some programs/lenders use progress advances and work validation; confirm who funds work between advances.
ROUGE / RED
Do not contract assuming every invoice will be funded immediately; lender rules, as-improved value and inspections can create a cash-flow gap.
Checks
What the professional checks
- Confirm lender rules and each draw condition
- Align budget, inspections, invoicing and interim liquidity
Official sources
V14
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V28
Finish and service details to verify
V28 connects small details that become costly once finishes are closed.