VERT / GREEN
Identify manufacturer, year, label/certification, foundation type and utility routing before work.
Coordinate foundation/anchorage, chassis, skirting, utilities, openings, additions and original certification instead of treating the home like ordinary site-built framing.
Identify manufacturer, year, label/certification, foundation type and utility routing before work.
Openings, additions, utility relocation or skirting changes can affect structure, frost, under-home ventilation and local compliance.
Modified chassis/foundation/anchorage, settlement or an attached addition without design: engineering/permit review first.
Helps choose the next step; does not replace design, permits or professional diagnosis.
Checked 2026-08-22.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V28 connects small details that become costly once finishes are closed.