VERT / GREEN
Photograph and retain the report, approved drawings and file references.
Turn a non-compliance finding into a traceable correction list with evidence and reinspection rather than hiding the problem.
Photograph and retain the report, approved drawings and file references.
Each correction can affect structure, fire, plumbing, electrical or envelope systems.
Respect the deadline and do not conceal work that must be reinspected; an order or hazard requires the appropriate stop.
Contractors and professionals correct to code, drawings and notice; the inspector or authority confirms required follow-up.