VERT / GREEN
Document elevations and door clearance seasonally.
Prevent porch, landing or stairs from moving independently and binding doors, cracking finishes or distorting guards.
This tool is for triage and documentation; structural, fire, gas, refrigerant and electrical work remains subject to applicable rules and professionals.
Document elevations and door clearance seasonally.
Footings, fill, drainage and house connection determine seasonal vs permanent movement.
Landing pushing house/door, unstable guard or major settlement: structural/foundation diagnosis.
Sources checked / sources vérifiées: 2026-08-22
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V18 connects systems that become costly or regulated when a primary project triggers them.
V29 connects smaller risks that often fall between finishes, appliances, plumbing and local code.