VERT / GREEN
Document position, plumb and height without adjusting.
Verify an adjustable/temporary post bears on an adequate footing and is not masking settlement by repeated adjustment.
This tool is for triage and documentation; structural, fire, gas, refrigerant and electrical work remains subject to applicable rules and professionals.
Document position, plumb and height without adjusting.
Even a small adjustment can redistribute loads, crack finishes or lift walls above.
Post on thin slab, unknown footing, corrosion, lean or repeated adjustment need: engineer/pro before touching.
Sources checked / sources vérifiées: 2026-08-22