Visible air/joint leaks: address acoustic openings first while respecting fire/air requirements.
Diagnose why sound bypasses a high-rated wall/ceiling through floors, joists, façades, ducts, outlets, joints and continuous structural elements.
Visible air/joint leaks: address acoustic openings first while respecting fire/air requirements.
Noise persists despite added insulation: map direct and flanking paths before adding more mass.
Do not cut/decouple a structural element or fire-rated assembly solely for acoustics.